Value added to client project
- The design acceptance window is discussed, reviewed and approved in advance (30 days) prior to conducting any intervention operations to help ensure they are safe and successful
- The intervention life cycle process and procedures, are designed to deliver the scope efficiently and able to maintain a continues improvement philosophy
- Enables the operator to gain access to an expert, experienced and competent team who are capable of handling multi interventions over long periods of time. As part of this value adding integrated solution, our material and travel coordinators support the campaign in order to ensure it runs efficiently and without delay.
In supplementing operations with our experts, the operator was able to:
- Gain access to intervention and process safety expert advice
- Enhance the competency of the team
- Assure compliance with standards
- Gain access to training and mentorship through the experienced engineers supplied
- Enables the operator to extend the operating life of safety critical components whilst assuring safety and integrity of the equipment
- Enables the operator to gain access to additional intervention expert knowledge to support the development of solutions for complex well integrity challenges
- Allows the operator to optimize existing producing assets and expand the operating life to enable operations to meet their production targets while attaining a low operating cost