Well Cost & Time

Before any investment decision is made, stakeholders want clarity over expected costs and timescales. With AGR’s state of the art time and cost estimation software application, PLANS™,  from our iQx™ platform, businesses are able to make better informed decisions based on a comprehensive analysis of all available data.

Eliminating the shortcuts

Time and cost estimation is often the aspect of well engineering that faces the harshest scrutiny. Estimates require a comprehensive understanding of all areas, risk, logistical arrangements and current market conditions. Experience in delivering a detailed plan really matters.

With established roots in all major oil and gas operational hubs globally, AGR offers independent and trusted well cost and time planning services worldwide. Whether it’s to verify existing plans, review a joint venture or collaborate with an operator to produce estimates, AGR can provide support.

Powerful technology that delivers key insight

Through our innovative technology, PLANS™, we provide clients with additional insight into project risks. This information is becoming increasingly important in communicating the challenges involved with high-risk operations.

Probabilistic planning tool PLANS™ is unique to other Monte Carlo simulators, having been purpose built for drilling engineers, by drilling engineers. As a cloud-based software, it’s also accessible anytime, anywhere, provided there is access to the internet.

It creates a suite of automated reports, including a detailed, line-by-line, Authorisation For Expenditure (AFE). These are segregated by cost code, with results easily exported and shared with other stakeholders.

iQx™ PLANS™ is both flexible and scalable, and used extensively within AGR for wide-ranging assignments – from conceptual planning to detailed design, drilling and completion to workover and abandonment.

Our powerful technology solution that delivers key insights

Through our innovative technology, PLANS™, we provide clients with additional insight into project risks. This information is becoming increasingly important in communicating the challenges involved with high-risk operations.

Probabilistic planning tool PLANS™ is unique to other Monte Carlo simulators, having been purpose built for drilling engineers, by drilling engineers. As a cloud-based software, it’s also accessible anytime, anywhere, provided there is access to the internet.

It creates a suite of automated reports, including a detailed, line-by-line, Authorisation For Expenditure (AFE). These are segregated by cost code, with results easily exported and shared with other stakeholders.

iQx™ PLANS™ is both flexible and scalable, and used extensively within AGR for wide-ranging assignments – from conceptual planning to detailed design, drilling and completion to workover and abandonment.

Questions? Get in touch

    Case studies

    Collaborative supply chain model helps deliver Buzzard Phase II development ahead of the revised schedule and with cost savings

    06.01.2023

    2 min read
    The Buzzard Phase II project was delivered by an Alliance, led by CNOOC International together with its supply chain partners...

    Read more

    Drilling software helps estimate well cost during remote Operations

    22.11.2022

    2 min read
    iQx drilling cost and risk forecasting (P1) and well cost tracker (CT) help Sasol to discover and seize new efficiencies...

    Read more

    AGR runs complex completion and performs test of re-entry well with zero delays

    06.09.2021

    4 min read
    AGR was engaged as Well Operator to handle all stages of a difficult well re-entry project during the Orlando field...

    Read more

    Probabilistic planning tool provides key insight to enable complex well re-entry

    25.08.2021

    3 min read
    iQx™ has enabled an operator to evaluate all possible outcomes for a range of proposed solutions for repairing a seriously...

    Read more

    Probabilistic planning achieves radical improvements in evaluating well abandonment methodologies

    25.08.2021

    8 min read
    iQx ™ P1™ demonstrated its powerful capabilities in enhancing the quality of the analysis required to decide optimum well abandonment...

    Read more

    AGR re-enters challenging well to cut and pull casing securing continuous operation

    25.08.2021

    4 min read
    The expertise of AGR’s Aberdeen-based Well Management team in a complex well re-entry was tested to the full. Continuing operation...

    Read more

    See more case studies