What we delivered
Assured well intervention readiness
Completed a 30-day readiness window before each well intervention activity to allow for a proactive review of the activity and subsequent adjustments to be made ahead of time.
Optimised well intervention planning and execution
Through the application of best-practice procedures gained through decades of experience and expertise, our engineers identified and implemented improvements opportunities into future intervention plans.
Optimised well flow and production
Through the completion of back-to-back multi-intervention campaigns, we were instrumental in assuring the well remained productive and fully optimized.
Bolstered platform expertise
Assist in supplying cross trained resources outside of the scope of contract, including “light weight Intervention vessel” well services support, drilling units work and well kill package logistics and QA.
Reduced mean time between failure
Reduced MTBF for insert safety valves following the introduction of new technology and equipment management strategies.
Steered a well life extension project
Reviewed all relevant well data from 49 wells to determine trends in failure modes and provided recommendations for additional well data gathering during intervention campaigns.